eVOIDPermanent formwork systems · Dubai, UAE

Build on air.
Not on fill.

eVOID void formers replace tonnes of sand, gravel and concrete fill with a strong, ventilated void, for lighter slabs, raised floors and faster programmes.

eVOID domes assembled on legs, bases and spacers
Recycled PP & PVC 4 parts · 1 system
71×71 cm
eVOID dome, 15 cm high, interlocking
Ø125 / Ø200
mm legs for different loads and spans
2.5 m
Max. crawl-space height with eVOID-EPS
30,000
kg/m² load on eVOID-EPS support elements
Why eVOID

Stop filling. Start forming.

Traditional raised floors are built on heavy fill or plastic chairs. eVOID creates the space instead: lighter for the structure, cleaner on site, and useful once it is built.

Traditional fill

Sand, gravel, EPS or concrete fill

  • Heavy dead load on slabs and foundations
  • Trucks, compaction and slow layer-by-layer work
  • Settlement risk over time
  • No access for services once buried
  • Moisture and ground gas trapped under the floor

eVOID

Disposable dome formwork with a ventilated void

  • High load-carrying capacity, lightweight slab
  • Hand-installed: easy, fast, high productivity
  • Less fill material, zero waste, easily portable
  • MEP services run through the void
  • Ventilated void controls humidity and radon gas
The eVOID range

One family. Every kind of void.

Choose the system for your slab: recycled-plastic domes, insulated EPS crawl spaces, lightweight geofoam fill or voided-slab units.

eVOID dome systemeVOID void with services
Recycled plastic formwork

eVOID Dome

Non-removable, disposable plastic dome formwork for reinforced-concrete raised floors. Bases and spacers form a grid, legs are cut to height and the domes lock on top. Concrete is poured over the domes, leaving a ventilated void below.

71×71 cmDome outer · 69×69 interlocking
15 cmDome height
Ø125 / Ø200 mmRecycled PVC legs, cut to height
Recycled PPDomes, bases & spacers
  • Raised floors
  • Foundations & pits
  • Car parks
  • Pool decks & basements
  • LV & substation rooms
  • Landscaping over structure
eVOID-EPS dome 90 by 90 cmeVOID-EPS foot 30.5 by 30.5 cm
eVOID-EPS floor build-up with underfloor heating
Insulated ventilated crawl space

eVOID-EPS

High-performance EPS elements act as formwork for the reinforced-concrete slab and as insulation at the same time. Structure and thermal insulation in a single pour, with no thermal bridges and a dry, ventilated cavity below.

90×90 cmEPS dome, variable height
30.5×30.5 cmEPS foot, variable height
λ = 0.037Thermal conductivity, W/mK
2% / 98%Material / air, low footprint
  • Crawl spaces up to 2.5 m
  • Cold rooms & NZEB buildings
  • Slab + foundation cast together
  • Raising existing floors
  • Underfloor heating ready
  • Self-extinguishing EPS
EPS geofoam blocks under a road pavement
Void filler & lightweight fill

eVOID-EPS Geofoam

Lightweight EPS geofoam blocks that cut loads and settlement. They prevent ground shifting and minimise structural damage, giving long-lasting support for paving, roadworks, retaining walls and landscaping.

HighCompressive strength
Very lowWeight on structure & soil
ReducedSettlement risk
FlexibleCut to any profile on site
  • Roads & embankments
  • Retaining walls
  • Podium landscaping
  • Paving over structure
  • Easy to install
  • Eco-friendly
Uni-VOID steel cage unit with five void formersUni-VOID slab section
Voided slab system

Uni-VOID

Factory-made Steel Cage Units (SCU), each holding five oval void formers made of recycled polypropylene. They make concrete slabs lighter and allow longer spans.

5Void formers per unit
350 mmCentre-to-centre spacing
35 mmMinimum gap between formers
Ø315 mmOval former, internal diameter
  • "Ladder" cage, Ø6 mm bars
  • 1775 mm unit length
  • Heights to suit slab
  • Two semi-shells per former
The eVOID system

Four parts. One interlocking system.

No screws, no glue, no special tools. Every component is made from recycled plastic and carried by hand.

01

eVOID Dome

71×71 cm · h 15 cm

Recycled polypropylene. 69×69 cm interlocking module that carries the slab.

02

eVOID Base

135×190 mm

Recycled polypropylene. Sits on the slab and receives the Ø125 mm leg.

03

eVOID Spacer

562×120 mm · h 11 mm

Recycled polypropylene. Links the bases into an accurate grid.

04

eVOID Leg

Ø125 or Ø200 mm

Recycled PVC. Cut to the floor height required; carries the domes.

2 leg sizes

Ø125 mm and Ø200 mm legs give different load resistances and allow large spans, so the system is matched to your structural design.

Ask an engineer

Raised floors

Lift a floor above slab level.

Fills

Foundations, sunken areas, pool decks, basements.

Services

Pass MEP lines through the void.

Method statement

From bare slab to finished floor

Click through the six steps. Our team supervises on site from layout to pour.

Step 1: clean slab Step 2: feet and legs set out Step 3: domes placed Step 4: steel mesh placed Step 5: concrete poured Step 6: floor finish 1 / 6
  1. 1

    Prepare

    Clear rubble and concrete residue from the slab.

  2. 2

    Bases, spacers & legs

    Start from any corner, link the bases and fit legs cut to height.

  3. 3

    Domes

    Lock domes right to left, top to bottom. Cut pieces to fill edge gaps.

  4. 4

    Reinforce

    Place steel mesh over the domes, plus bars in the legs and columns.

  5. 5

    Pour

    Fill the legs first, then pour at least C25 concrete over the domes.

  6. 6

    Finish

    Once the concrete reaches design strength, apply the floor finish.

Concrete

Minimum C25, S4 fluidity. Pump hose 20–30 cm above the domes.

Reinforcement

Ø8 hooked bar in legs above 50 cm. Double mats over 10 cm slabs.

Containment

Compress between shear walls on all four sides.

Ventilation

10–15 cm wall holes every 3–4 m, insect screened.

Proven performance

Load-tested at full scale

eVOID-EPS dome and foot elements were assembled and loaded with reinforced concrete at full scale to verify their bearing capacity.

30,000 kg/m²

Support elements carry loads up to 30,000 kg/m² without deformation of the floor over time.

−9.5 cm
Assembling eVOID-EPS elements for the load test
1
eVOID-EPS assembly ready for loading
2
eVOID-EPS loaded with concrete blocks
3
Measuring deformation after loading
4
Applications

Where eVOID works

Car parking

Raised, lightweight deck over a voided slab.

Foundations & pits

Voids formed inside concrete foundations.

Landscaping

Hardscape and softscape over structure.

LV & substation rooms

Raised floor with services routed through the void.

Pool decks & sunken areas

Lightweight fill around pools, basements and sunken slabs.

Cold rooms & warehouses

eVOID-EPS insulates and ventilates in one action, protecting industrial floors.

Roads & retaining walls

EPS geofoam reduces load and settlement.

Quick estimate

How much eVOID do you need?

Enter your floor area to get a first estimate, then send it to us for a full layout and quotation.

Your project

eVOID Dome: 69×69 cm interlocking module on recycled-PVC legs.

Estimated quantities
–Domes
–Bases & legs
–Leg pipe (m)
–Spacers
Approximate figures for a square layout, including about 5% for cutting at edges. Final quantities depend on your drawings, loads and leg size, and are confirmed by our engineers. Send this estimate for a quotation
On site

eVOID in the field

Recent installations across Dubai, from large podium slabs to villa pool decks.

Dome deck laid over a large slab area
Services run through the void
Void filling around a villa pool deck
Base grid and legs laid out; domes being installed
Domes locked on legs
eVOID-EPS crawl space being laid
Concrete pour over eVOID-EPS
Selected projects

Trusted on Dubai's landmark developments

KARTEK, Kayt Al Noor Technical Services L.L.C, was established in Dubai in 2023 to supply specially crafted materials for faster, lighter, more economical and greener construction.

Six Senses

Palm Jumeirah, Crescent C8

Creek Rise

Dubai Creek Harbour

The Palm Beach Towers

Jumeirah

Sobha Hartland

MBR

Cape Hayat

Mina Al Arab
Structural designValue engineeringDeformation studySupply of materialsSite supervisionInstallationThermal & U-value calculations
FAQ

Questions engineers ask

What does eVOID replace?

eVOID replaces sand, gravel, EPS and concrete fill under raised floors and inside foundations. Instead of a heavy mass, you get a ventilated void that is lighter for the structure and can carry services.

Which concrete and reinforcement are required?

Use a minimum C25 concrete with S4 fluidity, with the pump hose 20–30 cm above the domes. Place an Ø8 hooked bar in legs taller than 50 cm and double mesh for slabs over 10 cm. Legs are filled first, then the slab is poured.

How is the void ventilated?

Provide 10–15 cm wall openings every 3–4 m, fitted with insect screens. Ventilation through the void helps control humidity and radon gas from the ground.

Can MEP services run under the floor?

Yes. Pipes and cables pass through the void between the legs, which is why eVOID is used for LV rooms, substations and other service-heavy floors.

What is the difference between eVOID and eVOID-EPS?

eVOID uses recycled-plastic domes on cut PVC legs to form a ventilated void. eVOID-EPS uses high-performance EPS domes (90×90 cm) and feet, so the formwork is also the thermal insulation, ideal for crawl spaces up to 2.5 m, cold rooms and high-performance buildings.

Is eVOID sustainable?

Domes, bases and spacers are made of recycled polypropylene and legs of recycled PVC. The system uses less fill material, produces zero waste and is light enough to be carried by hand, with no heavy trucks or compaction.

Do you provide design support?

Yes. KARTEK provides structural design, value engineering, deformation studies, material supply and site supervision, plus submittal documents for consultant approval.

Contact

Let's build it together

Send your drawings, slab area and void height. We'll reply with a layout, technical proposal and quotation.

WhatsApp / Mobile+971 58 600 5120
Sales · Technicalsales@kaytalnoor.com
technical@kaytalnoor.com · info@kaytalnoor.com
OfficeAl Baraha, Dubai, UAE

Request an eVOID quotation

This opens as a ready-to-send WhatsApp message.